Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CA0099

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CA0099","CONSTRUCTION OF ELEMENTARY AND SECONDARY SCHOOL  BUILDINGS UNDER THE DEPEDS CY 2018 BASIC EDUCATIONAL FACILITIES FUND -  TWO (2) STOREY-FOUR (4) CLASSROOM, NAGBALAYONG  ELEM SCHOOL MORONG, BATAAN","Buildings and Facilities","Completed",13444265,0,100,"Bataan 1st DEO","Region III","BONIBAL CONSTRUCTION (9371)","2019-01-28","2019-05-27",2018,"Outside Infra - GAA 2018 DepEd BEFF",14.65618,120.29212,"300808000","300800000"]
SHA-256
3721ee02876f7deb4264d746926b2f6e5c63cb6dc61d137e8461d80f8d0258bb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.