Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CJ0259

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CJ0259","CONSTRUCTION OF 1 STOREY 2 CLASSROOM W/ CR, ABAGON ELEMENTARY SCHOOL, GERONA, TARLAC","Buildings and Facilities","Completed",3882492.34,0,100,"Tarlac DEO","Region III","G.M. TALAVERA CONSTRUCTION AND SUPPLIES (39035)","2019-01-09","2019-04-03",2018,"Outside Infra - GAA 2018 DepEd BEFF",15.61167,120.60917,"306906000","306900000"]
SHA-256
0a4347b4728564e74d5b7c468828a1a05757eabd98f1cfb897cbd66cc1365a97

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.