Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18CK0168

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18CK0168","REHABILITATION OF DAMAGED FLOOD CONTROL ALONG LUCUNG RIVER (SAN JOSE SECTION, RIGHT BANK), DOWNSTREAM OF STA. MARIA BRIDGE, CONCEPCION, TARLAC","Flood Control and Drainage","Completed",708845.58,0,100,"Tarlac 2nd DEO","Region III","ZNER CONSTRUCTION AND TRADING (44079)","2018-12-27","2019-01-24",2018,"Regular Infra - GAA 2018 LP",15.32864,120.65658,"306905000","306900000"]
SHA-256
794d56aad21db555fa983cb4149c24ce4736e42485c2d550f29b3f387e6b70c1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.