Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18DQ0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18DQ0028","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF REVETMENT ALONG BALUCTOT RIVER, PHASE III, EAST SIDE,","Flood Control and Drainage","Completed",11578016.83,0,100,"Region IV-A","Region IV-A","CBS CONSTRUCTION AND CONSTRUCTION SUPPLY (30244)","2018-02-15","2018-07-14",2018,"Regular Infra - GAA 2018 OO-2",14.31677,120.98045,"402106000","402100000"]
SHA-256
f9e05895f26891b1bb7c92df4717af7c854ab65bf389f77056c583d3e6392dcc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.