Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18EA0082

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18EA0082","PACKAGE 11-A)CONSTRUCTION OF BRGY. LAYLAY FLOOD CONTROL, BOAC, MARINDUQUE B)CONSTRUCTION OF BRGY. DU","GAA 2018 LP","Completed",6704409.82,0,100,"Marinduque DEO","MIMAROPA Region","HYPER J CONSTRUCTION & SUPPLY (33184)","2018-04-11","2018-09-15",2018,"Regular Infra - GAA 2018 LP",13.43841,121.81781,"1704001000","1704000000"]
SHA-256
28d2d4ac2d0906d82e5f699c535db90898db130b83c6748f0c4b263a9d8532a4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.