Hashed input (canonical JSON of the source row)
["dpwh","18FB0001","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION SYSTEM ALONG SUA-TUMPA RIVER, CAMALIG, ALBAY","Flood Control and Drainage","Completed",94051530.01,0,100,"Albay 2nd DEO","Region V","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2018-02-07","2018-06-30",2018,"Regular Infra - GAA 2018 OO-2",13.19794,123.6413,"500502000","500500000"]
SHA-256
d9bfeb6e2bc330f8ccb33fcd7e4ead442ba15d7aa87d56ae6e58fa1ccedf2e4a