Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FD0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FD0059","CONSTRUCTION OF CLASSROOMS (BATCH 1), ANTIPOLO HS, MINALABAC, CAMARINES SUR","Buildings and Facilities","Completed",17333904.64,0,100,"Camarines Sur 2nd DEO","Region V","EDROX CONSTRUCTION, INC. (10926)","2018-06-11","2019-01-04",2018,"Outside Infra - GAA 2018 DepEd BEFF",13.53167,123.15935,"501722000","501700000"]
SHA-256
b431bdc91dbef6a2e967870fa91d677c54eaefbef837b37d1d5e0ec5d19e3ff8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.