Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FG0131

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FG0131","CONSTRUCTION OF TWO (2) STOREY SCIENCE LABORATORY BUILDING FABRICA HIGH SCHOOL, FABRICA, BULA, CAMARINES SUR","Buildings and Facilities","Completed",8736475.64,0,100,"Camarines Sur 5th DEO","Region V","MAGDA CONSTRUCTION AND SUPPLY INC. (35439)","2018-10-16","2019-02-12",2018,"Outside Infra - GAA 2018 DepEd BEFF",13.49136,123.29163,"501706000","501700000"]
SHA-256
de9ecf3685a320e2ed3bcc3f4160b463dcf6c54e6db5de290b3c6d441e3c4d8a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.