Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FH0087

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FH0087","CONSTRUCTION/MAINTENANCE  OF FLOOD  MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER CONTROL ALONG THE RIVERBANK OF SICMIL BRIDGE, GIGMOTO, CATANDUANES","Flood Control and Drainage","Completed",9441949.54,0,100,"Catanduanes DEO","Region V","JR CONTRACTOR (9638)","2018-05-25","2018-09-30",2018,"Regular Infra - GAA 2018 OO-2",13.83388,124.39378,"502005000","502000000"]
SHA-256
5e9730a26a775db31cc12d46d1c5722b58d48ed0ac783ca82d7eb5c52ecbb81c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.