Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FI0199

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FI0199","COMPLETION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.0M) AT DELAVIN-RUBIA NATIONAL HIGH SCHOOL, AROROY, MASBATE","Buildings and Facilities","Completed",985841.06,0,100,"Masbate 2nd DEO","Region V","SANSA CONSTRUCTION AND SUPPLY (39227)","2018-12-16","2020-09-21",2018,"Outside Infra - GAA 2018 DepEd BEFF",12.54532,123.34667,"504101000","504100000"]
SHA-256
7f06b9e36e2db6db49c9c114b7495296e09f108dab8d2d740bf5d69f01b87317

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.