Project 18GP0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GP0011","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN AT BRGY. MANIBAD -  SINUNDOJAN, MAMBUSAO, CAPIZ","Flood Control and Drainage","Completed",48487401.83,0,100,"Capiz 2nd DEO","Region VI","F. GURREA CONSTRUCTION, INCORPORATED (6995)","2018-05-10","2019-10-25",2018,"Regular Infra - GAA 2018 OO-2",11.42063,122.57814,"601908000","601900000"]
SHA-256
d40269a6f166b247720393fef96f55662daf0adbbbda1c4f25ab9fd4f99d125d