Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0034","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-COMPLETION OF GUINDULMAN SHORE PROTECTION, GUINDULMAN, BOHOL","Flood Control and Drainage","Completed",27930167.99,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2018-02-20","2018-09-27",2018,"Regular Infra - GAA 2018 OO-2",9.7579,124.47854,"701223000","701200000"]
SHA-256
ad953e08bd2e96b5dbdd3c2086ab9befe434c7909aeee332dc5a2f81d0895721

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.