Hashed input (canonical JSON of the source row)
["dpwh","18HB0039","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PONOD RIVER CONTROL, SAWANG, GUINDULMAN, BOHOL","Flood Control and Drainage","Completed",9300000,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2018-02-21","2018-05-26",2018,"Regular Infra - GAA 2018 OO-2",9.76195,124.47902,"701223000","701200000"]
SHA-256
759e1c885690871c337d56a6bfaa46a9fe0f929cf002b7939bfd7fa781cd8672