Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0041","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SAN ANTONIO RIVER CONTROL, DUERO, BOHOL","Flood Control and Drainage","Completed",9457000,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2018-02-21","2018-05-26",2018,"Regular Infra - GAA 2018 OO-2",9.70982,124.40551,"701221000","701200000"]
SHA-256
a19632b019437834205bf30562a9a8ca90d11d00a76c0a5d8b6b1cbb37ae5300

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.