Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0084

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0084","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALEJAWAN RIVER CONTROL","Flood Control and Drainage","Completed",9310000,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2018-04-25","2018-07-28",2018,"Regular Infra - GAA 2018 OO-2",9.68829,124.40197,"701221000","701200000"]
SHA-256
f89ca370594524a76c4fac8d72f7de4cec7913e7580b07c240f40f667e5e881f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.