Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0100

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0100","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MADUA SUR RIVER CONTROL, DUERO, BOHOL","Flood Control and Drainage","Completed",4655000,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2018-04-25","2018-07-08",2018,"Regular Infra - GAA 2018 OO-2",9.69454,124.40005,"701221000","701200000"]
SHA-256
0bcb1898e690a89dee4f630b68ebb2407a987b1ec51cf35d308a77a6158acf72

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.