Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0109

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0109","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF CANSIBAO RIVER CONTROL, VALENCIA, BOHOL","Flood Control and Drainage","Completed",8714168,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2018-05-10","2018-10-15",2018,"Regular Infra - GAA 2018 OO-2",9.61774,124.2056,"701247000","701200000"]
SHA-256
224a1da3f56e5c4f42349213641ad5decbe55bc48a90b0ba2148c14ceccbbd02

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.