Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0155

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0155","CONCRETING OF  BRGY. TANGCASAN SUR-BRGY. TANGCASAN NORTE FMR, BRGY.  TANGCASAN SUR, LOAY, BOHOL STA. 0+000.00-STA. 0+414.28","Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",4776000,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2018-07-12","2018-08-30",2018,"Outside Infra - Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",9.64051,123.99333,"701228000","701200000"]
SHA-256
7e6a06e75e42b188cc68c8909bfe0dde1cd53bb8252ba5b780b0798332bd00af

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.