Project 18HD0038
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HD0038","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT LIBJO RIVER, BARANGAY LIBJO, TABOGON, CEBU ALONG CEBU NORTH HAGNAYA WHARF ROAD, BARANGAY LIBJO, TABOGON, CEBU","Flood Control and Drainage","Completed",19600000,0,100,"Cebu 4th DEO","Region VII","ZION CONSTRUCTION(FORMERLY MASTERPIECE CONST. & SU (14881)","2018-05-10","2018-11-11",2018,"Regular Infra - GAA 2018 OO-2",10.94862,123.96506,"702248000","702200000"]
SHA-256
9251f452e03ed1d6acd54040f3bc69dec425e7ca483c759f5f086d36cdb10433Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.