Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HH0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HH0049","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. BINALIW - AGSUNGOT, CEBU CITY","Flood Control and Drainage","Completed",41845162.82,0,100,"Cebu City DEO","Region VII","BNR CONSTRUCTION & DEVELOPMENT CORP. (12903)","2018-06-18","2019-02-28",2018,"Regular Infra - GAA 2018 OO-2",10.41077,123.91676,"730600000","702200000"]
SHA-256
db49887ed98bcacca9e6603e83334c0268a81acf183e6627998a05d8e9b79966

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.