Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HL0106

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HL0106","CONSTRUCTION OF 2 STY  4CL  SCHOOL BUILDING @ BASAY CENTRAL SCHOOL, BASAY,  NEGROS ORIENTAL","Buildings and Facilities","Completed",9135289.93,0,100,"Negros Oriental 3rd DEO","Negros Island Region","HASA KONSTRUKT AND SUPPLY (39362)","2019-01-15","2019-10-20",2018,"Outside Infra - GAA 2018 DepEd BEFF",9.35238,122.83734,"1804618000","1804600000"]
SHA-256
c148b544d0a9051c51e49ff9e643a60996428e7c43a87b8867195e2982779b8e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.