Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18II0132

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18II0132","CONSTRUCTION OF TWO (2) UNITS, ONE (1) STOREY - THREE (3) CLASSROOM SCHOOL BUILDING AT E. J. DULAY NATIONAL HIGH SCHOOL, LAOANG, NORTHERN SAMAR","Buildings and Facilities","Completed",12996935.09,0,100,"Northern Samar 2nd DEO","Region VIII","NORSATEK ENGINEERING AND CONSTRUCTION SUPPLY (26627)","2019-04-02","2019-12-05",2018,"Outside Infra - GAA 2018 DepEd BEFF",12.47842,125.07185,"804808000","804800000"]
SHA-256
875e6a20cabfa56eabcbe7244f7f457ce4e9803c232af4ce98143f69913d4add

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.