Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JA0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JA0014","CONSTRUCTION OF FLOOD CONTROL AT SINUNUC RIVER, (INCLUDING RIGHT OF WAY ACQUISITION), ZAMBOANGA CITY","Flood Control and Drainage","Completed",13360798.95,0,100,"Zamboanga City 2nd DEO","Region IX","TEDDIE CONSTRUCTION DEVELOPMENT, INC. (6313)","2018-04-04","2018-11-18",2018,"Regular Infra - GAA 2018 OO-2",6.94192,122.0075,"931700000","907300000"]
SHA-256
eb37b2b47899bee14dc2283d84fc482a1941ffe4bbd6141c1c18c59ced14db63

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.