Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JA0063

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JA0063","CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. TALON-TALON, ZAMBOANGA CITY","Flood Control and Drainage","Completed",1853897.85,0,100,"Zamboanga City 2nd DEO","Region IX","VYNE CONSTRUCTION & SUPPLY (37601)","2018-04-04","2018-06-25",2018,"Regular Infra - GAA 2018 LP",6.90959,122.10843,"931700000","907300000"]
SHA-256
d0f726f0302410c32825af3575b90a4d443b66d0956bb649f1defc3b9e099bbb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.