Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JC0070

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JC0070","CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY FOUR (4) CLASSROOM WORKSHOP COMBINED W/ TOILET AT GUTALAC NHS, GUTALAC, ZAMBOANGA DEL NORTE","Buildings and Facilities","Completed",16375937,0,100,"Zamboanga del Norte 3rd DEO","Region IX","LONG ISLAND BUILDERS & CONSTRUCTION (31730)","2018-07-08","2019-02-28",2018,"Outside Infra - GAA 2018 DepEd BEFF",7.98565,122.40549,"907223000","907200000"]
SHA-256
82dd167af363940980c7af2cd5f9925883e701125c3daba45cb5ff1b3495ab7d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.