Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18LA0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18LA0030","CONSTRUCTION OF ONE (1) UNIT, TWO (2) CLASSROOM (TYPE 1) FOR ADMINISTRATIVE BUILDING/FACULTY OFFICE, COMPOSTELA CHS, COMPOSTELA VALLEY PROVINCE","Buildings and Facilities","Completed",2365911.15,0,100,"Davao de Oro 1st DEO","Region XI","DANIMERH CONSTRUCTION & SUPPLY (17376)","2018-02-28","2018-05-11",2018,"Regular Infra - GAA 2018 LP",7.66923,126.09054,"1108201000","1108200000"]
SHA-256
f6518a2c5aa3fe6bbface0498792b72a2df3721fd0f759b63ab0ae3b90d78d35

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.