Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18LB0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18LB0032","INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER (F. TORRES BRIDGE SECTION) STA. 9+640-STA. 10+140 RIGHT BANK, DAVAO CITY","Flood Control and Drainage","Completed",44055077.13,0,100,"Davao City DEO","Region XI","ALFREGO BUILDERS & SUPPLY (19284) / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) (10433)","2018-03-08","2018-09-22",2018,"Regular Infra - GAA 2018 OO-2",7.09782,125.59278,"1130700000","1102400000"]
SHA-256
04f4d2188fff42a9924c8b2f9ff69dc21d6a074359b5c2be67a9929369d0b677

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.