Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18MD0074

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18MD0074","CONST. OF FLOOD MITIGATION STRUCTURE - CENTRAL LABAS FLOOD CONTROL, LIBUNGAN RIVER, MIDSAYAP, COTABATO","GAA 2018 OO-2","Completed",45541269.63,0,100,"Cotabato 1st DEO","Region XII","FFJJ CONSTRUCTION (16712) / SUNSTONE CONSTRUCTION & SUPPLY (11122)","2018-05-10","2018-12-28",2018,"Regular Infra - GAA 2018 OO-2",7.21808,124.45441,"1908708000","1908700000"]
SHA-256
d55a1fb5cac0cf32f20505e8bd98b5c954f1c2c1b29f500e18a2168df4a56867

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.