Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18NH0150

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18NH0150","CONSTRUCTION OF 1 UNIT, 2 STOREY ICT BUILDING, BADONG NATIONAL HIGH SCHOOL (SCHOOL ID. 317903) TAGO, SURIGAO DEL SUR","Buildings and Facilities","Completed",16815166.24,0,100,"Surigao del Sur 1st DEO","Region XIII","MOLROW CONSTRUCTION & SUPPLY (31326)","2019-01-14","2019-11-25",2018,"Outside Infra - GAA 2018 DepEd BEFF",8.96173,126.10025,"1606818000","1606800000"]
SHA-256
49f80d6568f52081358f8ffcf2000365be62a18290ec4d0153d39ba76546ffe1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.