Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19AD0061

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19AD0061","CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF TABLAC-BAGAR RIVER CONTROL, CANDON CITY, ILOCOS SUR","Flood Control and Drainage","Completed",9799999.14,0,100,"Ilocos Sur 2nd DEO","Region I","VIGAN FORTUNE CONSTRUCTION (3887)","2019-07-08","2019-12-30",2019,"Regular Infra - GAA 2019 OO-2",17.21417,120.45592,"102906000","102900000"]
SHA-256
c39b6eb063b2f8daeccfbe93958e900c43fd76de53d255256bd4b11838c6437f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.