Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19BI0046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19BI0046","LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE FLOOD CONTROL  STRUCTURE-CONSTRUCTION OF MAGAT RIVER CONTROL (CAGAYAN RIVER BASIN) BUENAVISTA SECTION   (PHASE 2) BRGY. BUENAVISTA, BAYOMBONG, NUEVA VIZCAYA","Flood Control and Drainage","Completed",14850000,0,100,"Nueva Vizcaya DEO","Region II","R.O. BUILDERS & DEVELOPMENT CORPORATION (22393)","2019-07-02","2019-09-07",2019,"Regular Infra - GAA 2019 LP",16.45208,121.10883,"205005000","205000000"]
SHA-256
a8b972c81c529cd9af207fb5d6e13fa027dfff2a7929f0fc7ef95e0cbc6613bf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.