Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19BI0047

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19BI0047","LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE FLOOD CONTROL  STRUCTURE-CONSTRUCTION OF MAGAT RIVER CONTROL (CAGAYAN RIVER BASIN) STA. ROSA SECTION   BRGY. STA. ROSA,  BAYOMBONG, NUEVA VIZCAYA","Flood Control and Drainage","Completed",14850000,0,100,"Nueva Vizcaya DEO","Region II","R.O. BUILDERS & DEVELOPMENT CORPORATION (22393)","2019-07-02","2019-10-25",2019,"Regular Infra - GAA 2019 LP",16.4821,121.17249,"205005000","205000000"]
SHA-256
786ec77b4a2d1fb778256ef9d185d175fc67216e0fa87a5bbd549198842f8bc9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.