Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19BJ0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19BJ0012","FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE  OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMCONSTRUCTION OF STA. CRUZ RIVER FLOOD CONTROL STRUCTURES, PINGKIAN SECTION (PHASE II), PINGKIAN, KAYAPA, NUEVA VIZCAYA","Flood Control and Drainage","Completed",29390158.38,0,100,"Nueva Vizcaya 2nd DEO","Region II","JOVIC CONSTRUCTION AND SUPPLY (35703)","2019-05-28","2019-12-23",2019,"Regular Infra - GAA 2019 OO-2",16.30963,120.95783,"205010000","205000000"]
SHA-256
2fccdbcb7913b5783c49b484b67746b837c114fd12a3cc6785e306589af298e2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.