Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CE0123

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CE0123","CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG CASONGSONG RIVER, BRGY. CASONGSONG, GUIMBA, NUEVA ECIJA","GAA 2019 OO-2","Completed",18761285.41,0,100,"Nueva Ecija 1st DEO","Region III","MIVICO 323 CONSTRUCTION CORP. (FORMERLY: MIVICO BUILDERS AND DEVELOPERS) (20551)","2019-06-29","2019-11-25",2019,"Regular Infra - GAA 2019 OO-2",15.67206,120.74695,"304911000","304900000"]
SHA-256
bf6c2a9752518fd3fc3b86e23a12023d74e2f80c705786fcb2fe90daa6a87e5a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.