Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CH0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CH0010","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF GUMI FLOOD CONTROL, LUBAO, PAMPANGA","Flood Control and Drainage","Completed",48936299.08,0,100,"Pampanga 2nd DEO","Region III","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2019-07-11","2019-12-07",2019,"Regular Infra - GAA 2019 OO-2",14.90951,120.60607,"305408000","305400000"]
SHA-256
fca7c64592d8b8361521025398a4658e953151ee5d0ee64933fb4de5e0c6a2df

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.