Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CL0039

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CL0039","CONSTRUCTION OF MALABON-MALIMANGA-SINABACAN FLOOD CONTROL PHASE I, CANDELARIA, ZAMBALES","Flood Control and Drainage","Completed",26890617.01,0,100,"Zambales 1st DEO","Region III","STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)","2019-08-23","2019-12-07",2019,"Regular Infra - GAA 2019 OO-2",15.63994,119.95047,"307103000","307100000"]
SHA-256
c387377c6178973b0280895a358b61898bd9a5b78ed1d69cc827cd38e756db3a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.