Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CL0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CL0040","CONSTRUCTION OF MALABON-MALIMANGA-SINABACAN FLOOD CONTROL PHASE II, CANDELARIA, ZAMBALES","Flood Control and Drainage","Completed",26567207.06,0,100,"Zambales 1st DEO","Region III","STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)","2019-09-23","2019-12-09",2019,"Regular Infra - GAA 2019 OO-2",15.64415,119.94914,"307103000","307100000"]
SHA-256
7e81ae4453ef2d16a41d9108f45c8581188602ed48e22731eaa25c9aba9111ef

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.