Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DF0110

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DF0110","LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. 59, CAVITE CITY; CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. 53-A, CAV","Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys)","Completed",10889973.35,0,100,"Cavite 1st DEO","Region IV-A","BAQPRINCE CONSTRUCTION AND TRADING CORP. (28337)","2019-09-02","2019-12-30",2019,"Regular Infra - Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys)",14.47953,120.89696,"402105000","402100000"]
SHA-256
b0fb3d047c434368e60ac349ad0b2799d002d2c51867c929707e10be675befb7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.