Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DK0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DK0051","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES-UPGRADING OF SPILLWAY @ BARANGAY AYAAS, TAYABAS CITY-QUEZON","Flood Control and Drainage","Completed",1960000,0,100,"Quezon 1st DEO","Region IV-A","ANNCON BUILDERS (36097)","2019-07-03","2019-09-01",2019,"Regular Infra - GAA 2019 OO-2",14.02665,121.60702,"405647000","405600000"]
SHA-256
b0c1d27c58ebcfb91cb0ea1e04ed1d6605456bcabe8113d1b64dd1568d4cfd54

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.