Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19EI0085

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19EI0085","CONSTRUCTION-MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN MARIANO RIVER CONTROL, MADUGO RIVER, ROXAS, ORIENTAL MINDORO","GAA 2019 OO-2","Completed",18639387.81,0,100,"Southern Mindoro DEO","MIMAROPA Region","A.D.L. CONSTRAK OPC (FORMERLY: A.D.L. CONSTRAK) (26442)","2019-06-16","2020-01-22",2019,"Regular Infra - GAA 2019 OO-2",12.63466,121.44542,"1705212000","1705200000"]
SHA-256
9f4f07f3dbbe6b033afe5bb30d2c218969d80b8f5a0fce14151e72e8e8312381

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.