Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FE0037

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FE0037","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST./REHAB./IMPROVEMENT, BRGY. MANGAYAWAN FLOOD CONTROL, CANAMAN, CAMARINES SUR","Flood Control and Drainage","Completed",18443000,0,100,"Camarines Sur 3rd DEO","Region V","M3A CONSTRUCTION (32123)","2019-06-10","2020-07-17",2019,"Regular Infra - GAA 2019 OO-2",13.61861,123.1275,"501710000","501700000"]
SHA-256
1a4cb7f6422f752a94b8f2283bf05448eabbcf82d4827aeae34b5a950bf4a6a7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.