Project 19FH0081

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FH0081","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUCTION OF FLOOD CONTROL SYSTEM, SICMIL, GIGMOTO, CATANDUANES","Flood Control and Drainage","Completed",9798860,0,100,"Catanduanes DEO","Region V","JR CONTRACTOR (9638)","2019-07-12","2019-11-02",2019,"Regular Infra - GAA 2019 OO-2",13.83276,124.39498,"502005000","502000000"]