Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19HB0001

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HB0001","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF NAPO RIVER CONTROL, NAPO, ALICIA, BOHOL","Flood Control and Drainage","Completed",27312168,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2019-06-26","2019-12-22",2019,"Regular Infra - GAA 2019 OO-2",9.87724,124.46555,"701202000","701200000"]
SHA-256
56fa239c32fc262904d9a41ee1a826ffc05661eddbe32e6e4a3e0b81a1d74830

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.