Project 19HB0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HB0012","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF LOBOC RIVER CONTROL, LOBOC, BOHOL","Flood Control and Drainage","Completed",19010168,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2019-06-26","2019-12-07",2019,"Regular Infra - GAA 2019 OO-2",9.63279,124.02771,"701229000","701200000"]