Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19HB0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HB0019","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF MANAO RIVER CONTROL, POBLACION, GARCIA HERNANDEZ, BOHOL","Flood Control and Drainage","Completed",4655168,0,100,"Bohol 3rd DEO","Region VII","MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2019-06-25","2019-10-01",2019,"Regular Infra - GAA 2019 OO-2",9.61137,124.28952,"701222000","701200000"]
SHA-256
6d0acd3997bd8a18cb2029a341c75ca8d67752f1d084a0084c647fe8e76eaf35

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.