Project 19HF0033
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HF0033","CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE AT STA. ANA RIVER ALONG CARCAR-BARILI ROAD/BARILI MANTAYUPAN ROAD, K0060+564, BRGY. POBLACION, BARILI, CEBU","Flood Control and Drainage","Completed",29397721.66,0,100,"Cebu 3rd DEO","Region VII","FIRST GRANDEUR BUILDERS INC. (FORMERLY: FIRST GRANDEUR BUILDERS) (35388) / P.B. OBIAL CONSTRUCTION (16784)","2019-07-07","2020-02-10",2019,"Regular Infra - GAA 2019 OO-2",10.11795,123.50799,"702210000","702200000"]
SHA-256
f74beb9cac973b1fe32a35782272cdadadc70d248999108538c423f83b994454Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.