Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IB0193

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IB0193","CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 1), BRGY. SUROK, BORONGAN CITY, EASTERN SAMAR","Buildings and Facilities","Completed",1484998.46,0,100,"Eastern Samar DEO","Region VIII","D.T. ESTARON ENGINEERING & CONSTRUCTION (5082)","2019-07-22","2019-09-04",2019,"Regular Infra - GAA 2019 LP",11.62813,125.42119,"802604000","802600000"]
SHA-256
feeab66038c9aa3bc5dfafeedf5b7813b9251589bbd569c10fe0021d1596064b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.