Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IJ0054

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IJ0054","CONSTRUCTION / IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG SAN JOAQUIN CREEK, PHASE I, BRGY. SAN JOAQUIN (PUROK 10), CALBAYOG CITY,SAMAR","Flood Control and Drainage","Completed",9714804.6,0,100,"Samar 1st DEO","Region VIII","SAMARINAN CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: SAMARINAN CONSTRUCTION) (18303)","2019-07-04","2019-10-14",2019,"Regular Infra - GAA 2019 OO-2",12.18457,124.4101,"806003000","806000000"]
SHA-256
66d0da7795450b5bc21224293a4f869974762869a1a594499c87fcb412853b88

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.