Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19JA0152

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19JA0152","CONSTRUCTION OF DRAINAGE SYSTEM AT TUGBUNGAN ELEMENTARY SCHOOL, BARANGAY TUGBUNGAN, ZAMBOANGA CITY","Flood Control and Drainage","Completed",1979925.44,0,100,"Zamboanga City 2nd DEO","Region IX","RME CONSTRUCTION AND ENTERPRISES (43825)","2019-08-31","2020-02-21",2019,"Regular Infra - GAA 2019 LP",6.91895,122.10409,"931700000","907300000"]
SHA-256
e54ed2b0151fb2e3b470580fefff78007cf0e1077dcb122f216f3e1b03a40a29

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.