Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19MA0016

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19MA0016","CONSTRUCTION OF RIVERBANK PROTECTION ALONG RIO GRANDE DE MINDANAO (KALANGANAN TO BUCANA SECTION, PHASE II), COTABATO CITY","Flood Control and Drainage","Completed",20821658.85,0,100,"Cotabato City DEO","Region XII","R.B. ALCAZAR CONSTRUCTION CORP. (FOR:R.B. ALCAZAR CONST. & DEV'T) (18967)","2019-08-01","2020-01-23",2019,"Regular Infra - GAA 2019 OO-2",7.24165,124.22112,"1908703000","1908700000"]
SHA-256
5adf4675822335a9468cac8f689731436fcb86b1d10a3846f81a0d2b7be17ffa

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.